Intelligent Industrial Energy Management & Power Quality Telemetry
Track power consumption per machine, eliminate costly maximum demand penalties, monitor power factor in real-time, and compute exact Specific Energy Consumption (SEC) per finished piece.
Stop Energy Waste Where It Actually Happens
For heavy fabrication plants, foundries, and manufacturing facilities, electrical energy represents 15% to 35% of total operating expenditures. Yet most factories only receive a single consolidated utility bill at the end of the month, with zero insight into which furnace, compressor, or machining cell wasted power during off-peak hours.
NexTurner Technologies installs networked digital energy meters and IoT telemetry gateways that record voltage, current, kWh, kVAh, Power Factor (PF), and Total Harmonic Distortion (THD) second-by-second across all production bays.
Our Energy Monitoring Offerings
Granular Machine Sub-Metering
Isolate energy consumption down to individual high-draw industrial machines.
- Sub-metering for ovens, compressors, furnaces, CNC cells, and chillers
- RS-485 Modbus RTU networked multi-function meters (MFMs)
- Live kWh consumption graphs updated every second
- Detection of phantom energy draw when machines are left idling overnight
Maximum Demand & Power Factor Guard
Prevent expensive utility contract surcharges and penalty invoices.
- Real-time kVA tracking against EB / electricity board sanctioned demand limit
- Predictive sliding-window alerts before maximum demand limit is breached
- Continuous Power Factor (PF) monitoring to maximize utility incentive rebates
- Instant WhatsApp and SMS alarms triggered to plant maintenance engineers
Power Quality & Harmonics Telemetry
Protect sensitive CNC and electronics from erratic grid voltage and harmonics.
- Total Harmonic Distortion (THD % for current and voltage) tracking
- Voltage sag, swell, phase imbalance, and transient frequency monitoring
- Diagnosis of transformer overheating and capacitor bank degradation
- Historical event logging to hold utility providers accountable for power cuts
Specific Energy Consumption (SEC) Analytics
Correlate electrical units directly with physical production pieces.
- Mathematical computation: kWh consumed divided by good pieces produced
- Benchmarking energy cost per kg / per ton across production shifts
- Identification of worn tooling or deteriorating bearings causing excessive motor draw
- Automated compliance reporting ready for ISO 50001 energy audits
Immediate Commercial Payback
5% to 12% Energy Savings
Identifying idle line consumption and compressor air leaks generates immediate month-over-month utility bill reductions.
Zero Penalty Invoices
Sliding-window demand threshold alerts prevent catastrophic utility peak demand penalties and power factor fines.
ISO 50001 Readiness
Automated historical energy logs and departmental baselines provide verifiable evidence for corporate green audits.
Energy System Implementation
- 01
Electrical Panel Survey
Auditing plant main switchboards, sub-distribution panels, and transformer ratings.
- 02
Meter & CT Installation
Installing DIN-rail Multi-Function Meters (MFMs) with split-core Current Transformers.
- 03
Gateway Network Integration
Connecting meters via shielded RS-485 Modbus daisy-chain to IoT edge gateways.
- 04
Threshold & Alert Setup
Configuring kVA peak demand limits, shift energy budgets, and recipient alert lists.
- 05
Dashboard & Handover
Deploying live monitoring screens in the electrical control room and management offices.
Frequently Asked Questions
Does installing energy meters require long power shutdowns?
No. By utilizing split-core Current Transformers (CTs), we can meter critical circuits without cutting conductors, requiring only a brief 15–30 minute scheduled shutdown for voltage reference taps.
Can we track non-electrical utilities like water, gas, or compressed air?
Yes. Our IoT telemetry gateways feature analog (4-20mA / 0-10V) and pulse inputs to track flow meters for compressed air, LPG/PNG gas, and industrial water consumption alongside electrical energy.
How are peak demand alerts delivered?
Alerts are sent within 5 seconds via WhatsApp messages and SMS to maintenance managers when plant load approaches 90% and 95% of the sanctioned contract demand.
Ready to Reduce Your Plant Energy Expenses?
Schedule an electrical telemetry audit with our energy specialists in Coimbatore. We will review your utility bills and outline a sub-metering installation plan.